Request a Quote
Share the equipment and project requirements. If you need help selecting a model, describe the application.
Have drawings or specifications? Email [email protected] with your project reference.
Industry guides
Explore how transformers and switchgear serve EV charging depots, data centers, industrial plants and battery storage projects.
Browse by industry below, or go directly to EV charging, AI data centers or battery storage.
Plan a distribution substation upgrade, feeder extension or transformer replacement around the circuits that must stay live. The outage plan determines which feeders can carry the transferred load while the new transformer is connected.
Explore utility distribution
Compare power distribution for mine electrification and microgrids, semiconductor fabs and battery cell factories. A mine may shed crushers to keep pumps running. A fab extension needs to keep air handling and chilled water available to the operating line.
Explore industrial facilities
Explore EV charging station transformers, AI data center power distribution, port shore power and water treatment plant power supply. A depot is often constrained by its import limit. A data hall must also account for the IT and cooling loads that transfer to the surviving supply during maintenance.
Explore public infrastructure
Trace the AC connection for grid-scale battery energy storage (BESS) and solar-plus-storage substations from the converter to the grid. A shared export limit governs the grid meter. Check the PV and battery branches separately because they can carry different power flows behind that meter.
Explore renewable energyProject example
A fleet depot can have more dispensers than power cabinets. At the utility connection, the important figure is the combined AC input of the cabinets charging at the same time, plus other loads on the site. See the depot sizing example.
Confirm the service voltage and permitted import with the utility.
Confirm how many dispensers share each cabinet and which cabinets can operate together.
Mark the incoming and outgoing terminals on your single-line diagram. Use those boundaries to decide which items belong in the equipment quotation.

Match the voltage change, capacity and installation conditions.

Combine the transformer, switchgear and enclosure in one station.

Select incoming, outgoing and protection panels by feeder.
Have a single-line diagram or a load schedule? Request a project quote.